10 Ways to Save on a Home Remodeling Project
A Home Remodeling Project Doesn't Have to Wipe
out Your Savings Account
By Mark J. Donovan
|
|
1) After deciding to pull the trigger on a home remodeling project, first
develop a set of high level plans and a budget. The plans can be as simple
as just a few hand sketches however they should include top level
dimensional information, key features and a list of the type of construction
material desired. This type of information is extremely helpful for
architects and builders, and will save you a bundle of money in developing
blue prints and building plans. |
Establishing an upfront budget is
also key in saving money, as it sets your financial limits before construction
begins. The design of the home remodeling plans can be tuned to your budget to
minimize the risk of cost overruns. Also keep in mind that when undertaking a
home remodeling project, budget overruns frequently happen. Therefore it is wise
to include a 5-10% contingency in your budget.
2) Obtain multiple contractor quotes, never accept the first bid that you get,
and always check references. Make sure you thoroughly review the quote and read
the fine print. Frequently there is small print for engineering change notices,
material cost overruns, etc. Make sure you fully understand the cost
ramifications of making late changes and that the quote is a firm, fixed quote.
Also check the references. Ignorance can be very expensive so it is important
that you know who you are hiring before you hand over a large deposit to them.
3) If a contractor quote includes allocation budgets for flooring, lighting or
bathroom fixtures and recommends you deal with a specific home improvement
store, ask the contractor and the store what type of reduced contractor pricing
rate you are receiving. If none or little is offered, then consider this in your
evaluation of the contractor quote.
|
|
4) Develop a schedule for your home
remodeling project and stick to it. This may mean having to occasionally be on
your general contractor’s case, or his sub-contractors. However, a project that
is poorly managed can cost you in terms of lost time or inefficient use of
labor, which always translates into higher expenses. Delays can also result in
loss of project slated sub-contractors or higher fees from them.
|
5) When developing your high level
remodeling plans consider what tasks you personally might be up for tackling.
Interior painting and trim work can cost a small fortune. With the right
commitment level and a few basic painting and carpentry tools, e.g. a paint
brush, ladder, miter saw and a coping saw, you can save yourself a bundle on
labor costs.
6) Most contractors want to order the construction material for you in a home
remodeling project. The reason for this is that they charge a fee for their
effort. That fee can be 10-20% of the material costs. Negotiate with the
contractor to purchase the material yourself and have it delivered directly from
the home improvement store. You can save a small fortune in project costs by
purchasing the construction material yourself. This effort can be time
consuming, however if you have a good and clear bill of materials (BOM), you can
frequently leave it with the contractor organization within the home improvement
store and they will work up the costs for you. In addition, they can pallet the
material and deliver it to your job site.

1) 7)
Always obtain multiple BOM proposals, and if necessary break up the BOM into a
few different sections. For example if you are building a home addition, doors
and windows may be cheaper at home improvement store 1, whereas lumber material
may be cheaper at home improvement store 2.
8) Monitor the status of the home remodeling project daily. This way you can be
on top of any deviations from the plans or poor workmanship. By catching a
problem early you can minimize the cost impact to the project. In addition, if
God-for-bid you see a change that you want to make, you can possibly identify
the change earlier rather than later. Note that making an engineering change
after the work has already been completed has a cost impact of 3X what it would
have cost if you had specified the requirement correct the first time.
9) Keep your future sub-contractors apprised of the remodeling project status.
By keeping your sub-contractors in the know, you remind them that they will be
imminently required on your job site. In addition, if your project gets delayed
or pulled in, the sub-contractor may be able to tweak his or her schedule to
match your home remodeling projects schedule.
10) Finally, always try to maintain a healthy working relationship with your
general contractors and sub-contractors. This does not mean that you have to bow
to their every need or timeline. It simply means show them the same respect that
you desire, even though they are working for you. Remember that a happy employee
will, more often than not, work harder and longer, and produce a better quality
project than a disgruntled one.
For more help on building a room addition, see HomeAdditionPlus.com's
Room Addition Bid sheet.
The
Room Addition Bid Sheet
will help ensure that your room addition project goes smoothly and is
completed on time and budget.
How to Finance your Home Remodeling Project -
can help provide funds for your new home improvement project if financing is
required.
Related information on Building a Family Room Addition
Additional Home Remodeling and Building Resources
from Amazon.com
Free Family Room Addition
Price Quotes with No Obligation!
Fill out our 3-5 minute quick and easy form, and receive a
free price quote on a home addition from one of our prescreened and licensed
home addition contractors. This process is free and there is no obligation to
continue once you receive your home addition price estimate.
|
|
|